+46 40 43 12 20 info@itbf.se

Projects

 

 Inalum Indonesia                                     New APS-System.                                                                                                                   2019

 

 

AR Packaging Flexibles                             Burner replacement on printing press.                                                                              2019 

 

 

 Kemira VP Fabriken                                  Updating of burner equipment on the steam reformer.                                                2019

 

 

 Alcoa Mosjön                                             Update of APS-System.                                                                                                          2019 

 

 

 Metso Minerals                                          Burner system TATA Steel India.                                                                                          2018

 

 

Norcarb Engineered Carbons AB            Low calorie burner system P90.                                                                                            2018                                       

 

Westerlins Hetgas                                      Burner system for hot air production.                                                                                  2018

 

 

Sekab Ö-Vik                                                 Exhaust steam boiler.                                                                                                               2017

 

 

Cortus Stockholm                                       2 Hot gas units for synthesis gas pruduction.                                                                      2017

 

 

Södra Näs Vimmerby                                 Support burner 1 MW Biogas.                                                                                                 2017

 

E.ON LFC Malmö                                         Replacement of burner with control EO 5 120 MW.                                                            2016           

 

Gelita Stidsvig                                              Rebuilding BMS system and low NOx burner.                                                                       2016

 

 

Pågen Malmö                                               Reconstructing of BMS system bakery oven.                                                                         2016                   

 

E.ON Utklippan Malmö                               Replacement of burner with control EO 5 160 MW.                                                             2015                                         

 

Akzo Nobel Chile                                          Update og BMS system for hydrogen combustion.                                                              2015

 

 

Paroc Hässleholm                                        Conversion of burner system from oil to LPG.                                                                       2015        

 

Arlövs Sockerbruk                                        Replacement of control system to ABB 800 with approved burner blocks.                      2015

 

 

Varbergs Krematorium                                Replacement of control system for Siemens PCS 7 with approved burner blocks.         2015

Outotec In LKAB project in Gällivare, Sweden, where LKAB is changing fuel from Heavy Fuel Oil to Natural gas have we delivered 4 burner systems with Dual Fuel Lances. We also delivered armature trains , BMS and safety system with safety-PLC. 2014
Foseco Burner system for drying and preheating av Foseco Initek ladles. Gas fired burner system with pulse firing and very exact temperature control. Preheating temperature up to 1250 °C. 2014
Eon Heleneholmsverket, steam boiler and domestic heat, Malmö, Sweden. New BMS system with Air/Gas ratio control system for 6 pcs of 30 MW burner on Boiler 12. 2014
Outotec 30 pcs of burner systems for Iron Ore Pelletizing plant in China. Our special designed burner lances for Coke Oven Gas, 4 MW each. Complete burner systems with armature trains for Coke Oven Gas and Primary combustion air, local Operator panels and Connection boxes, all made for ATEX zone 2. Flame supervision with UV-calls and High Energy Ignitors with pneumatic Retractions. 2013
Outotec 34 pcs of burner systems for Iron Ore Pelletizing plant in Iran. Our special designed burner lances for Natural Gas and Diesel Oil, 3,2 MW each. 2013
Eon Heleneholmsverket, steam boiler and domestic heat, Malmö, Sweden. New BMS system with Air/Gas ratio control system for 6 pcs of 30 MW burner on Boiler 10. 2013
Outotec GmbH 36 pcs burner systems with armatures for Pelletizing plant. 3 MW burners for Natural gas. Plant in Russia, built according to EN746, GOST and ATEX directive. 2012-13
Cryo/AGA Rebuildning of flare for LNG-terminal in Nynäshamn. New armatures, control and safety system. ATEX High energy igniter and continuous natural gas pilot. 2012-13
Uvån Tundish pre-heater system, 600 kW, Natural gas for Brazil. 2012
Studsvik Nuclear Converting from Diesel as fuel to LNG of the HA-furnace. New burners, armatures, control and safety system, 2 pcs 2 MW burners. 2012
Boliden Rännskär Tundish burner for Caldo furnace. Fuel Diesel, 2 MW, pulse fired to achieve very good temperature balance. 2011
Studsvik Nuclear Pyrolysis system for Uranium contaminated waste from Uranium fuel factories. The waste contains Uranium particles that can be recycled. The waste is processed in batches in a Pyrolysis vessel and gasifies. Pyrolysis gas is combusted is an Incinerator, passes a flue gas boiler and produces steam for process and for domestic heat production. The flue gases are cleaned in a bag house, a wet scrubber with demister and a carbon filter. From the Ashes in the Pyrolysis vessel can Uranium be recovered. 2011
Bona Kemi Catalytic gas cleaning system for process gases. Capacity 500 nm3/h. 2010
Stockholm gas Mobile flare for commissioning of LNG in Stockholm gas net. Capacity approx 25 MW. 2010
Studsvik Nuclear Destruction of radioactive active Carbon. The Carbon is grinded to powder (d90<100 my) and Combusted together with Diesel alternative Natural gas in a destruction furnace with Incinerator. A cleaning system with bag house, lime and carbon filters Catch particles. 2010
Outotec GmbH 40 pcs burner system with armature racks and junction boxes. 4,3 MW each. 14 psc for CO-gas, 22 pcs for Tar oil, 4 pcs Dual fuel. For Pelletizing furnace in India. 2009
SCA
Munksund
2 pcs Gas pilots on heavy oil fired boiler. 120 kW each, Propane. 2009
Trelleborg Rubore Fuel conversion from Light oil to Propane on 2 Incinerators, 2 Thermo oil boiler and 1 hot water boiler. 2009
Skansen New burners for bakery furnace at Solliden Skansen. 2 pcs 85 kW burners for Town gas. 2009
SSAB
Luleå
Drying furnace for cated products, 600ºC. 6 pulse fired burners for Coke oven gas. 2009
Trelleborg Rubore
Kalmar
Incinerator system for process gas from vulcanisation press. Incinerator for 9000 nm3/h process gas, 850ºC at 2 seconds, Propane 1,5 MW. Heat exchanger for incoming process gas, heat exchanger for thermo oil pre heating, heat exchanger for district water, Thermo oil boiler 500 kW. 2009
Outotec GmbH 32 burner systems with armature racks, 5,3 MW each for Coke oven gas. Pelletizing furnace China. 2008
UHT 2 burner systems for pre heating casting set. 1 burner system for rotary dryer. 2008
Horse cremation
Munka-Lungby
Cremation system for horses, 800 kg batch. 3 pcs natural gas burners in Furnace, 1 pcs of natural gas burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse. 2007
Painting spray box
Bredäng
2 pcs of Hot air system for paint box 2007
Uddeholm Technology Brasilien 2 burner systems for preheating of casting set. 1 burner system for rotating dryer. 2007
Studsvik Nuclear Burner system and handling system for incineration of contaminated turbine oil. 2007
Lekebergs
Pet Cremation
Cremation system for small animals, 200 kg batch. 2 pcs oil burners in furnace, 1 pcs of oil burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse. 2007
Painting spray box
Karlstad
5 pcs of Hot air system for paint box. 2007
ITT Flygt
Emmaboda
Refractory dryout and heating system 2007
Painting spray box
Malmö
Hot air system for paint box 2007
Trelleborg Rubore
Kalmar
Increase of capacity in existing Incineration plant, Increasing of the Incinerator volume 2007
SEKAB
Örnsköldsvik
New steam flue gas boiler for Incineration system 2006-07
Ovako Steel
Hofors
Gas mixing station for propane/butane 30/70 and air to heat value 5 kWh/nm3, 7,5 MW. Equipped with a Flare. 2006
Ovako Steel
Hofors
2 pcs Batch furnaces, 4ton, 1210ºC, puls fired. 2006

Kontaktuppgifter

Industri-Teknik Bengt Fridh AB
Företagsvägen 16
232 37 Arlöv

Telefon: 040-43 12 20
Epost: info@itbf.se

Jourtelefon
Dygnet runt, året runt
Tel: 0706-81 43 31

Contact

Industri-Teknik Bengt Fridh AB
Företagsvägen 16
232 37 Arlöv
Sweden

Phone: +46 40-43 12 20
Email: info@itbf.se

After-hours phone
24 hours, All year
cell phone: +46 706-81 43 31

sv_SESwedish