2024 Projects
Sinosteel, Grand Union Angang, China
28 burners incl flame supervision and igniters
Hebei Pelletizing, Grand Union, China
68 burners incl flame supervision and igniters
Metso Ruifeng, China
24 burners incl flame supervision, igniters and gas trains
Kemira, HCl factory, Sweden
Burner system, upgrades/improvements
2023 Projects
VA-Syd Ellinge, Sweden
Gas distribtion system
Hydro, Norge
Uppdatering APS
Zhaofeng, China
Complete burner packages, 26 pcs
Algeria
Complete burner packages, 30 pcs
Perstorp
Burner systems
2022 Projects
Fujian Long Steel, China
Complete burner packages, 18 pcs
Metso Outotec Group, Oman
Complete burner packages
Nanjing Jinjiang, China
Complete burner packages, 28 pcs
Jianlong Zilin, China
Complete burner packages, 30 pcs
Adven Kvarntorp, Sweden
New control cabinet
Metso Outotec Group, NMDC Ltd India
Complete burner packages, 24 pcs
Pågen, Malmö
Change to new control cabinet
Metso Outotec Group, Qian, China
Complete burner packages, 28 pcs
2021 Projects
Maa Steel, China
Complete burner packages, 26 pcs
Guangxi Shenlong, China
Complete burner packages, 24 pcs
3M, Sweden
Upgrade with regards to safety and control
Kunming iron & steel, China
Complete burner packages, 18 pcs
LKAB
Complete chanel burner system
Bara mineraler, Sweden
Upgrade of dryer furnace
Outotec Xi Chang, China
22 pcs burners
Bangtuo, China
Complete burner packages, 28 pcs
Zeeco Utklippan
Sweden, gas- and oil -train incl BMS controller system
Zhonggang Binhai, China
Complete burner packages, 32 pcs
Yuxi, China
Complete burner packages, 28 pcs
2020 Projects
Harrin AB, Sweden
Pilot burner gas train and control cabinet
Nantong, China
Complete burner packages, 22 pcs
Sekab, Sweden
A number of burners for multiple types of fuels together with relevant equipment, post burning chamber and boiler.
Danogips, Sweden
Rebuild of igniter and new burner
Hydro, APS
As well as rebuild and update of burners
2019 Projects
Alcoa Mosjön
Update of APS-System
Kemira Sweden
Updating of Update on burner equipment on the steam reformer.
Ar Packaging Flexibles
Burner change on printing press
Inalum Indonesien
New APS-System
Kemira Sweden
Natural gas and venting gas train
2018 Projects
Westerlins Hetgas
Burner system for hot air production.
Norcarb Engineered Carbons AB
Low calorie burner system P90.
Metso Minelrals
Burner system TATA Steel India.
2017 Projects
Södra näs Vimmerby
Support burner 1 MW Biogas
Cortus Stockholm
2 Hot gas units for synthesis gas pruduction.
SEKAB Ö-Vik
Exhaust steam boiler EBK
2016 Projects
E.on Utklippan Malmö
Replacement of burner with control EO 5 160 MW.
Pågens Malmö
Reconstructing of BMS system bakery oven.
Gelita Stidsvig
Rebuilding BMS system and low NOx burner.
E.on LFC Malmö
Replacement of burner with control EO 5 120 MW.
2015 Projects
Varbergs Krematiorium
Replacement of control system for Siemens PCS 7 with approved burner blocks.
Arlövs Sockerbruk
Replacement of control system to ABB 800 with approved burner blocks.
Paroc Hässleholm
Conversion of burner system from oil to LPG
Akzo Nobel Chile
Update og BMS system for hydrogen combustion.
2014 Projekt
Eon
Heleneholmsverket, steam boiler and domestic heat, Malmö, Sweden. New BMS system with Air/Gas ratio control system for 6 pcs of 30 MW burner on Boiler 12.
Foseco
Burner system for drying and preheating av Foseco Initek ladles. Gas fired burner system with pulse firing and very exact temperature control. Preheating temperature up to 1250 °C.
Outotec
In LKAB project in Gällivare, Sweden, where LKAB is changing fuel from Heavy Fuel Oil to Natural gas have we delivered 4 burner systems with Dual Fuel Lances. We also delivered armature trains , BMS and safety system with safety-PLC.
2013 Projekt
Eon
Heleneholmsverket, steam boiler and domestic heat, Malmö, Sweden. New BMS system with Air/Gas ratio control system for 6 pcs of 30 MW burner on Boiler 10.
Outotec
34 pcs of burner systems for Iron Ore Pelletizing plant in Iran. Our special designed burner lances for Natural Gas and Diesel Oil, 3,2 MW each.
Outotec
30 pcs of burner systems for Iron Ore Pelletizing plant in China. Our special designed burner lances for Coke Oven Gas, 4 MW each. Complete burner systems with armature trains for Coke Oven Gas and Primary combustion air, local Operator panels and Connection boxes, all made for ATEX zone 2. Flame supervision with UV-calls and High Energy Ignitors with pneumatic Retractions.
2012 Projekt
Studsvik Nuclear
Converting from Diesel as fuel to LNG of the HA-furnace. New burners, armatures, control and safety system, 2 pcs 2 MW burners.
Uvån
Skänkvärmare, 600 kW, naturgas för Brasilien.
Cryo/AGA
Rebuildning of flare for LNG-terminal in Nynäshamn. New armatures, control and safety system. ATEX High energy igniter and continuous natural gas pilot.
Outotec GmbH
36 pcs burner systems with armatures for Pelletizing plant. 3 MW burners for Natural gas. Plant in Russia, built according to EN746, GOST and ATEX directive.
2011 Projekt
Studsvik Nuclear
Pyrolysis system for Uranium contaminated waste from Uranium fuel factories. The waste contains Uranium particles that can be recycled. The waste is processed in batches in a Pyrolysis vessel and gasifies. Pyrolysis gas is combusted is an Incinerator, passes a flue gas boiler and produces steam for process and for domestic heat production. The flue gases are cleaned in a bag house, a wet scrubber with demister and a carbon filter. From the Ashes in the Pyrolysis vessel can Uranium be recovered.
Boliden Rönnskär
Tundish burner for Caldo furnace. Fuel Diesel, 2 MW, pulse fired to achieve very good temperature balance.
2010 Projekt
Studsvik Nuclear
Destruction of radioactive active Carbon. The Carbon is grinded to powder (d90<100 my) and Combusted together with Diesel alternative Natural gas in a destruction furnace with Incinerator. A cleaning system with bag house, lime and carbon filters Catch particles.
Stockholm gas
Mobile flare for commissioning of LNG in Stockholm gas net. Capacity approx 25 MW.
Bona Kemi
Katalytisk reningsanläggning för processgaser. Kapacitet 500 nm3/h
2009 Projekt
SCA Munksund
2 pcs Gas pilots on heavy oil fired boiler. 120 kW each, Propane.
Outotec GmbH
40 pcs burner system with armature racks and junction boxes. 4,3 MW each. 14 psc for CO-gas, 22 pcs for Tar oil, 4 pcs Dual fuel. For Pelletizing furnace in India.
Trelleborg Rubore Kalmar
Incinerator system for process gas from vulcanisation press. Incinerator for 9000 nm3/h process gas, 850ºC at 2 seconds, Propane 1,5 MW. Heat exchanger for incoming process gas, heat exchanger for thermo oil pre heating, heat exchanger for district water, Thermo oil boiler 500 kW.
SSAB Luleå
Drying furnace for cated products, 600ºC. 6 pulse fired burners for Coke oven gas.
Skansen
New burners for bakery furnace at Solliden Skansen. 2 pcs 85 kW burners for Town gas.
Trelleborg Rubore
Fuel conversion from Light oil to Propane on 2 Incinerators, 2 Thermo oil boiler and 1 hot water boiler.
2008 Projekt
UHT
2 burner systems for pre heating casting set. 1 burner system for rotary dryer.
Outotec GmbH
32 burner systems with armature racks, 5,3 MW each for Coke oven gas. Pelletizing furnace China.
2007 Projekt
Lekebergs smådjurskremering
Cremation system for small animals, 200 kg batch. 2 pcs oil burners in furnace, 1 pcs of oil burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse.
Studsvik Nuclear
Burner system and handling system for incineration of contaminated turbine oil.
Uddeholm Technology Brasilien
2 st brännarsystem för förvärmning av gjutformar. 1 st brännarsystem för roterugn
Lackeringsanläggningar Bredäng
2 pcs of Hot air system for paint box
Trelleborg Rubore Kalmar
Increase of capacity in existing Incineration plant, Increasing of the Incinerator volume
Lackeringsanläggningar Malmö
Hot air system for paint box
Lackeringsanläggningar Karlstad
5 pcs of Hot air system for paint box.
ITT Flygt Emmaboda
Refractory dryout and heating system
Hästkrematorium Munka-Lungby
Cremation system for horses, 800 kg batch. 3 pcs natural gas burners in Furnace, 1 pcs of natural gas burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse.
2006 Projekt
Ovako Steel Hofors - 2006
Gasblandningsstation, blandgasol och luft blandas till värmevärde 5 kWh/nm3, 7,5 MW. Utrustning försedd med fackla.
Ovako Steel Hofors - 2006
2 pcs Batch furnaces, 4ton, 1210ºC, puls fired.
SEKAB Örnsköldsvik 2006-2007
Byte av avgaspanna för destruktionsanläggning