+46 40 43 12 20 info@itbf.se

2024 Projects

Sinosteel, Grand Union Angang, China

28 burners incl flame supervision and igniters

Hebei Pelletizing, Grand Union, China

68 burners incl flame supervision and igniters

Metso Ruifeng, China

24 burners incl flame supervision, igniters and gas trains

Kemira, HCl factory, Sweden

Burner system, upgrades/improvements

2023 Projects

VA-Syd Ellinge, Sweden

Gas distribtion system

Hydro, Norge

Uppdatering APS

Zhaofeng, China

Complete burner packages, 26 pcs

Algeria

Complete burner packages, 30 pcs

Perstorp

Burner systems

2022 Projects

Fujian Long Steel, China

Complete burner packages, 18 pcs

Metso Outotec Group, Oman

Complete burner packages

Nanjing Jinjiang, China

Complete burner packages, 28 pcs

Jianlong Zilin, China

Complete burner packages, 30 pcs

Adven Kvarntorp, Sweden

New control cabinet

Metso Outotec Group, NMDC Ltd India

Complete burner packages, 24 pcs

Pågen, Malmö

Change to new control cabinet

Metso Outotec Group, Qian, China

Complete burner packages, 28 pcs

2021 Projects

Maa Steel, China

Complete burner packages, 26 pcs

Guangxi Shenlong, China

Complete burner packages, 24 pcs

3M, Sweden

Upgrade with regards to safety and control

Kunming iron & steel, China

Complete burner packages, 18 pcs

LKAB

Complete chanel burner system

Bara mineraler, Sweden

Upgrade of dryer furnace

Outotec Xi Chang, China

22 pcs burners

Bangtuo, China

Complete burner packages, 28 pcs

Zeeco Utklippan

Sweden, gas- and oil -train incl BMS controller system

Zhonggang Binhai, China

Complete burner packages, 32 pcs

Yuxi, China

Complete burner packages, 28 pcs

2020 Projects

Harrin AB, Sweden

Pilot burner gas train and control cabinet

Nantong, China

Complete burner packages, 22 pcs

Sekab, Sweden

A number of burners for multiple types of fuels together with relevant equipment, post burning chamber and boiler.

Danogips, Sweden

Rebuild of igniter and new burner

Hydro, APS

As well as rebuild and update of burners

2019 Projects

Alcoa Mosjön

Update of APS-System  

Kemira Sweden

Updating of Update on burner equipment on the steam reformer.

Ar Packaging Flexibles

Burner change on printing press 

Inalum Indonesien

New APS-System

Kemira Sweden

Natural gas and venting gas train

2018 Projects

Westerlins Hetgas

Burner system for hot air production.

Norcarb Engineered Carbons AB

Low calorie burner system P90.   

Metso Minelrals

Burner system TATA Steel India. 

2017 Projects

Södra näs Vimmerby

Support burner 1 MW Biogas

Cortus Stockholm

2 Hot gas units for synthesis gas pruduction.

SEKAB Ö-Vik

Exhaust steam boiler EBK 

2016 Projects

E.on Utklippan Malmö

Replacement of burner with control EO 5 160 MW.

Pågens Malmö

Reconstructing of BMS system bakery oven. 

Gelita Stidsvig

Rebuilding BMS system and low NOx burner.  

E.on LFC Malmö

Replacement of burner with control EO 5 120 MW.

2015 Projects

Varbergs Krematiorium

Replacement of control system for Siemens PCS 7 with approved burner blocks.

Arlövs Sockerbruk

Replacement of control system to ABB 800 with approved burner blocks.

Paroc Hässleholm

Conversion of burner system from oil to LPG  

Akzo Nobel Chile

Update og BMS system for hydrogen combustion.

2014 Projekt

Eon

Heleneholmsverket, steam boiler and domestic heat, Malmö, Sweden. New BMS system with Air/Gas ratio control system for 6 pcs of 30 MW burner on Boiler 12.

Foseco

Burner system for drying and preheating av Foseco Initek ladles. Gas fired burner system with pulse firing and very exact temperature control. Preheating temperature up to 1250 °C.

Outotec

In LKAB project in Gällivare, Sweden, where LKAB is changing fuel from Heavy Fuel Oil to Natural gas have we delivered 4 burner systems with Dual Fuel Lances. We also delivered armature trains , BMS and safety system with safety-PLC.

2013 Projekt

Eon

Heleneholmsverket, steam boiler and domestic heat, Malmö, Sweden. New BMS system with Air/Gas ratio control system for 6 pcs of 30 MW burner on Boiler 10.

Outotec

34 pcs of burner systems for Iron Ore Pelletizing plant in Iran. Our special designed burner lances for Natural Gas and Diesel Oil, 3,2 MW each.

Outotec

30 pcs of burner systems for Iron Ore Pelletizing plant in China. Our special designed burner lances for Coke Oven Gas, 4 MW each. Complete burner systems with armature trains for Coke Oven Gas and Primary combustion air, local Operator panels and Connection boxes, all made for ATEX zone 2. Flame supervision with UV-calls and High Energy Ignitors with pneumatic Retractions.

2012 Projekt

Studsvik Nuclear

Converting from Diesel as fuel to LNG of the HA-furnace. New burners, armatures, control and safety system, 2 pcs 2 MW burners.

Uvån

Skänkvärmare, 600 kW, naturgas för Brasilien.

Cryo/AGA

Rebuildning of flare for LNG-terminal in Nynäshamn. New armatures, control and safety system. ATEX High energy igniter and continuous natural gas pilot.

Outotec GmbH

36 pcs burner systems with armatures for Pelletizing plant. 3 MW burners for Natural gas. Plant in Russia, built according to EN746, GOST and ATEX directive.

2011 Projekt

Studsvik Nuclear

Pyrolysis system for Uranium contaminated waste from Uranium fuel factories. The waste contains Uranium particles that can be recycled. The waste is processed in batches in a Pyrolysis vessel and gasifies. Pyrolysis gas is combusted is an Incinerator, passes a flue gas boiler and produces steam for process and for domestic heat production. The flue gases are cleaned in a bag house, a wet scrubber with demister and a carbon filter. From the Ashes in the Pyrolysis vessel can Uranium be recovered.

Boliden Rönnskär

Tundish burner for Caldo furnace. Fuel Diesel, 2 MW, pulse fired to achieve very good temperature balance.

2010 Projekt

Studsvik Nuclear

Destruction of radioactive active Carbon. The Carbon is grinded to powder (d90<100 my) and Combusted together with Diesel alternative Natural gas in a destruction furnace with Incinerator. A cleaning system with bag house, lime and carbon filters Catch particles.

Stockholm gas

Mobile flare for commissioning of LNG in Stockholm gas net. Capacity approx 25 MW.

Bona Kemi

Katalytisk reningsanläggning för processgaser. Kapacitet 500 nm3/h

2009 Projekt

SCA Munksund

2 pcs Gas pilots on heavy oil fired boiler. 120 kW each, Propane.

Outotec GmbH

40 pcs burner system with armature racks and junction boxes. 4,3 MW each. 14 psc for CO-gas, 22 pcs for Tar oil, 4 pcs Dual fuel. For Pelletizing furnace in India.

Trelleborg Rubore Kalmar

Incinerator system for process gas from vulcanisation press. Incinerator for 9000 nm3/h process gas, 850ºC at 2 seconds, Propane 1,5 MW. Heat exchanger for incoming process gas, heat exchanger for thermo oil pre heating, heat exchanger for district water, Thermo oil boiler 500 kW.

SSAB Luleå

Drying furnace for cated products, 600ºC. 6 pulse fired burners for Coke oven gas.

Skansen

New burners for bakery furnace at Solliden Skansen. 2 pcs 85 kW burners for Town gas.

Trelleborg Rubore

Fuel conversion from Light oil to Propane on 2 Incinerators, 2 Thermo oil boiler and 1 hot water boiler.

2008 Projekt

UHT

2 burner systems for pre heating casting set. 1 burner system for rotary dryer.

Outotec GmbH

32 burner systems with armature racks, 5,3 MW each for Coke oven gas. Pelletizing furnace China.

2007 Projekt

Lekebergs smådjurskremering

Cremation system for small animals, 200 kg batch. 2 pcs oil burners in furnace, 1 pcs of oil burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse.

Studsvik Nuclear

Burner system and handling system for incineration of contaminated turbine oil.

Uddeholm Technology Brasilien

2 st brännarsystem för förvärmning av gjutformar. 1 st brännarsystem för roterugn

Lackeringsanläggningar Bredäng

2 pcs of Hot air system for paint box

Trelleborg Rubore Kalmar

Increase of capacity in existing Incineration plant, Increasing of the Incinerator volume

Lackeringsanläggningar Malmö

Hot air system for paint box

Lackeringsanläggningar Karlstad

5 pcs of Hot air system for paint box.

ITT Flygt Emmaboda

Refractory dryout and heating system

Hästkrematorium Munka-Lungby

Cremation system for horses, 800 kg batch. 3 pcs natural gas burners in Furnace, 1 pcs of natural gas burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse.

2006 Projekt

Ovako Steel Hofors - 2006

Gasblandningsstation, blandgasol och luft blandas till värmevärde 5 kWh/nm3, 7,5 MW. Utrustning försedd med fackla.

Ovako Steel Hofors - 2006

2 pcs Batch furnaces, 4ton, 1210ºC, puls fired.

SEKAB Örnsköldsvik 2006-2007

Byte av avgaspanna för  destruktionsanläggning

en_GBEnglish