Projects
Inalum Indonesia New APS-System. 2019
AR Packaging Flexibles Burner replacement on printing press. 2019
Kemira VP Fabriken Updating of burner equipment on the steam reformer. 2019
Alcoa Mosjön Update of APS-System. 2019
Metso Minerals Burner system TATA Steel India. 2018
Norcarb Engineered Carbons AB Low calorie burner system P90. 2018
Westerlins Hetgas Burner system for hot air production. 2018
Sekab Ö-Vik Exhaust steam boiler. 2017
Cortus Stockholm 2 Hot gas units for synthesis gas pruduction. 2017
Södra Näs Vimmerby Support burner 1 MW Biogas. 2017
E.ON LFC Malmö Replacement of burner with control EO 5 120 MW. 2016
Gelita Stidsvig Rebuilding BMS system and low NOx burner. 2016
Pågen Malmö Reconstructing of BMS system bakery oven. 2016
E.ON Utklippan Malmö Replacement of burner with control EO 5 160 MW. 2015
Akzo Nobel Chile Update og BMS system for hydrogen combustion. 2015
Paroc Hässleholm Conversion of burner system from oil to LPG. 2015
Arlövs Sockerbruk Replacement of control system to ABB 800 with approved burner blocks. 2015
Varbergs Krematorium Replacement of control system for Siemens PCS 7 with approved burner blocks. 2015
Outotec | In LKAB project in Gällivare, Sweden, where LKAB is changing fuel from Heavy Fuel Oil to Natural gas have we delivered 4 burner systems with Dual Fuel Lances. We also delivered armature trains , BMS and safety system with safety-PLC. | 2014 |
Foseco | Burner system for drying and preheating av Foseco Initek ladles. Gas fired burner system with pulse firing and very exact temperature control. Preheating temperature up to 1250 °C. | 2014 |
Eon | Heleneholmsverket, steam boiler and domestic heat, Malmö, Sweden. New BMS system with Air/Gas ratio control system for 6 pcs of 30 MW burner on Boiler 12. | 2014 |
Outotec | 30 pcs of burner systems for Iron Ore Pelletizing plant in China. Our special designed burner lances for Coke Oven Gas, 4 MW each. Complete burner systems with armature trains for Coke Oven Gas and Primary combustion air, local Operator panels and Connection boxes, all made for ATEX zone 2. Flame supervision with UV-calls and High Energy Ignitors with pneumatic Retractions. | 2013 |
Outotec | 34 pcs of burner systems for Iron Ore Pelletizing plant in Iran. Our special designed burner lances for Natural Gas and Diesel Oil, 3,2 MW each. | 2013 |
Eon | Heleneholmsverket, steam boiler and domestic heat, Malmö, Sweden. New BMS system with Air/Gas ratio control system for 6 pcs of 30 MW burner on Boiler 10. | 2013 |
Outotec GmbH | 36 pcs burner systems with armatures for Pelletizing plant. 3 MW burners for Natural gas. Plant in Russia, built according to EN746, GOST and ATEX directive. | 2012-13 |
Cryo/AGA | Rebuildning of flare for LNG-terminal in Nynäshamn. New armatures, control and safety system. ATEX High energy igniter and continuous natural gas pilot. | 2012-13 |
Uvån | Tundish pre-heater system, 600 kW, Natural gas for Brazil. | 2012 |
Studsvik Nuclear | Converting from Diesel as fuel to LNG of the HA-furnace. New burners, armatures, control and safety system, 2 pcs 2 MW burners. | 2012 |
Boliden Rännskär | Tundish burner for Caldo furnace. Fuel Diesel, 2 MW, pulse fired to achieve very good temperature balance. | 2011 |
Studsvik Nuclear | Pyrolysis system for Uranium contaminated waste from Uranium fuel factories. The waste contains Uranium particles that can be recycled. The waste is processed in batches in a Pyrolysis vessel and gasifies. Pyrolysis gas is combusted is an Incinerator, passes a flue gas boiler and produces steam for process and for domestic heat production. The flue gases are cleaned in a bag house, a wet scrubber with demister and a carbon filter. From the Ashes in the Pyrolysis vessel can Uranium be recovered. | 2011 |
Bona Kemi | Catalytic gas cleaning system for process gases. Capacity 500 nm3/h. | 2010 |
Stockholm gas | Mobile flare for commissioning of LNG in Stockholm gas net. Capacity approx 25 MW. | 2010 |
Studsvik Nuclear | Destruction of radioactive active Carbon. The Carbon is grinded to powder (d90<100 my) and Combusted together with Diesel alternative Natural gas in a destruction furnace with Incinerator. A cleaning system with bag house, lime and carbon filters Catch particles. | 2010 |
Outotec GmbH | 40 pcs burner system with armature racks and junction boxes. 4,3 MW each. 14 psc for CO-gas, 22 pcs for Tar oil, 4 pcs Dual fuel. For Pelletizing furnace in India. | 2009 |
SCA Munksund |
2 pcs Gas pilots on heavy oil fired boiler. 120 kW each, Propane. | 2009 |
Trelleborg Rubore | Fuel conversion from Light oil to Propane on 2 Incinerators, 2 Thermo oil boiler and 1 hot water boiler. | 2009 |
Skansen | New burners for bakery furnace at Solliden Skansen. 2 pcs 85 kW burners for Town gas. | 2009 |
SSAB Luleå |
Drying furnace for cated products, 600ºC. 6 pulse fired burners for Coke oven gas. | 2009 |
Trelleborg Rubore Kalmar |
Incinerator system for process gas from vulcanisation press. Incinerator for 9000 nm3/h process gas, 850ºC at 2 seconds, Propane 1,5 MW. Heat exchanger for incoming process gas, heat exchanger for thermo oil pre heating, heat exchanger for district water, Thermo oil boiler 500 kW. | 2009 |
Outotec GmbH | 32 burner systems with armature racks, 5,3 MW each for Coke oven gas. Pelletizing furnace China. | 2008 |
UHT | 2 burner systems for pre heating casting set. 1 burner system for rotary dryer. | 2008 |
Horse cremation Munka-Lungby |
Cremation system for horses, 800 kg batch. 3 pcs natural gas burners in Furnace, 1 pcs of natural gas burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse. | 2007 |
Painting spray box Bredäng |
2 pcs of Hot air system for paint box | 2007 |
Uddeholm Technology Brasilien | 2 burner systems for preheating of casting set. 1 burner system for rotating dryer. | 2007 |
Studsvik Nuclear | Burner system and handling system for incineration of contaminated turbine oil. | 2007 |
Lekebergs Pet Cremation |
Cremation system for small animals, 200 kg batch. 2 pcs oil burners in furnace, 1 pcs of oil burner in Incinerator. Cooling system with water injection, Multi cyclone and baghouse. | 2007 |
Painting spray box Karlstad |
5 pcs of Hot air system for paint box. | 2007 |
ITT Flygt Emmaboda |
Refractory dryout and heating system | 2007 |
Painting spray box Malmö |
Hot air system for paint box | 2007 |
Trelleborg Rubore Kalmar |
Increase of capacity in existing Incineration plant, Increasing of the Incinerator volume | 2007 |
SEKAB Örnsköldsvik |
New steam flue gas boiler for Incineration system | 2006-07 |
Ovako Steel Hofors |
Gas mixing station for propane/butane 30/70 and air to heat value 5 kWh/nm3, 7,5 MW. Equipped with a Flare. | 2006 |
Ovako Steel Hofors |
2 pcs Batch furnaces, 4ton, 1210ºC, puls fired. | 2006 |